Domestic

Domestic Technical Survey

Green Genie Energy would normally need from 90 minutes to 3 hours to carry out each technical survey. At each property this is the information that will be taken and collected.

  • Photography of all rooms, openings and current heating system
  • Photography of electric meter, gas meter and consumer unit
  • Measurements of all rooms, doors, windows and ceiling heights
  • Measurements of all radiators, new radiator locations and hot water cylinder location
  • Investigate and record the fabric of construction for all elements of the property
  • Check the loft insulation
  • Check the water pressure and pipe runs / sizes
  • Check the size of the loft hatch and airing cupboard where appropriate
  • Draw accurate, scale plans of the property
    Check the power supply
  • Discussion of the technology involved, possible project pros and cons and implications of any of the above findings.

This is a simplified overview of the general information that is needed to be taken on a survey for a heat pump installation.
After this information has been collected, full heat loss calculations will be completed as well as a fresh EPC. These documents as well as a full debrief and explanation of the findings of the survey with the customer completes the survey.

Click Here to view a typical Heat Loss Survey

Contact Green Genie Energy for more information.